NEWS

featured

  • 08/11/2021
    The Caixinha da Sustentabilidade (Sustainability Box) has completed six months since being implemented

    In the period, 2,292 Saquinhos of Fertilizers, produced in our composting, were donated, corresponding to 1,833 kg.
    Read more

  • 06/22/2021
    MultiRio e MultiCar receive ISO 45001 certification

    We always take the safety and health of your employees very seriously. For this reason, we are very proud to announce that MultiRio and MultiCar, both companies in the Multiterminais Group, have recei
    Read more

  • 06/18/2021
    CLIA and Porto Seco Resende receive their OEA-Segurança certificate

    Porto Seco Resende (Terminal Logístico Vale do Paraíba Ltda) and CLIA Rio de Janeiro (Multiterminais Alfandegados do Brasil SA) received their respective OEA-Segurança depositary certificates on June
    Read more


other news

  • 05/27/2021 MultiRio and MultiCar comply with Bureau Veritas SAFE GUARD requirements for COVID-19

    Check the status of the seal
    Read more

  • 05/08/2021 Transporters have few days to register in the access system to the Port of Rio

    Officials say the deadline will no longer be postponed.
    Read more

  • 04/30/2021 Trucks gain new road access between Avenida Brasil and port of Rio

    The expectation is that 2,600 vehicles travel on the avenue daily.
    Read more

  • 01/27/2021 Port of Rio de Janeiro activates transceivers of the Cotunduba Canal signaling buoys

    Modern nautical signaling became part of the Mobile Maritime Service, generating greater safety for navigation
    Read more

  • 12/09/2020 335-meter container ship sails through the Cotunduba Canal at night

    It is the first time that a ship of this size goes out on the way at night
    Read more

  • 12/08/2020 MultiRio's opening hours during Christmas and New Year in 2020

    Please note the changes in the Terminal's opening hours
    Read more

  • 10/30/2020 Social action in the Port of Rio de Janeiro helps needy families in Caju

    The social action took place on the morning of Wednesday (28).
    Read more

  • 10/14/2020 MultiRio invests in new Portainer Super Post Panamax

    On October 6, MultiRio new Portainer Super Post Panamax left the Shanghai factory in China.
    Read more

  • 09/15/2020 Carriers using the Port of Rio de Janeiro must register with the new computerized access system for Docas

    Measure reduces permission waiting time from up to seven days to just seven hours.
    Read more

    1 2 3 4 5 6 7 8 9 10  ...     

photos and videos

See full gallery

case studies

See all results
  • Gerdau's Industrial Plant in Ouro Branco

    Multitermiais partnered with the Gerdau group on the steel project in the city of Ouro Branco – MG. Multiterminais participated in all stages of the logistics process of this huge operation.

    Read more
  • Mercedes Benz: Total Parts Inventory Control

    The logistics process, from the import of parts, until the delivery to the Mercedes-Benz factory in Juiz de Fora is made by ALB. ALB is a joint venture between Multiterminais and Schenker International, one of the largest freight forwarders in the world.

    Read more

last news

View all news
  • 1108/2021
    The Caixinha da Sustentabilidade (Sustainability Box) has completed six months since being implemented
    Read more
  • 2206/2021
    MultiRio e MultiCar receive ISO 45001 certification
    Read more
  • 1806/2021
    CLIA and Porto Seco Resende receive their OEA-Segurança certificate
    Read more