Working With SIGVIG

04.01.2018

For cargos which are discharged after March 30th, only those that have Status SIGVIG "Not selected" or "Conform (clearence)" will be clereanced for removal. This status is already available for consultation on our site in customer's area: "STATUS DE CARGA" e na "AVERBAÇÃO".​


Share:   

other news

  • 0512/2017

    Check the operating hours of the MultiRio Container Terminal during the end of the year holidays

    Read more
  • 3010/2014

    New Sustainable Equipment for Port Operations arrives for use at the Multirio Container Terminal

    Read more

photos and videos

View full gallery

case studies

View all studies
  • Gerdau's Industrial Plant in Ouro Branco

    Multitermiais partnered with the Gerdau group on the steel project in the city of Ouro Branco – MG. Multiterminais participated in all stages of the logistics process of this huge operation.

    Read more
  • Mercedes Benz: Total Parts Inventory Control

    The logistics process, from the import of parts, until the delivery to the Mercedes-Benz factory in Juiz de Fora is made by ALB. ALB is a joint venture between Multiterminais and Schenker International, one of the largest freight forwarders in the world.

    Read more

last news

View all news
  • 18Apr/18
    Recycle

    MultiRio and MultiCar achieved 10 years of recycling in...

    Read more
  • 01Apr/18
    Working With SIGVIG

    For cargos which are discharged after March 30th, only ...

    Read more
  • 05Dec/17
    Check the operating hours of the MultiRio Container Terminal during the end of the year holidays

    See the schedules....

    Read more